• About Us &
    Information
    About Us and Information
  • Market
    Segments
    Market Segments
  • Explore
    Our Products
    Our Products
  • Engineered
    Site Solutions
    Engineered Site Solutions
  • Join
    Our Team
    Join Our Team
Search
Find product
  • News
  • Downloads
  • Case Studies
  • About Us
  • Contact Us
  • AVK Holding (Group)
  • Sustainability

Search

  • Choose category
  • All
  • Penstocks
  • Gross Price List
  • Dealing with us
  • Sustainability
  • Non Utility Infrastructure
  • Clean Water and Wastewater
  • Engineered Site Solutions
  • Hydropower
  • Reservoirs
  • Policies
  • Certificates
  • Case Studies
  • Brochures

157 Result(s)

Lochaber 3

Lochaber Site Visit

Extending Asset Life Through Sustainable Service & Maintenance
Go to page
InterLink 71

Interlink 71

Download
KBS Teaser Image

Glenfield Invicta Reaches Key Factory Acceptance Testing Milestone for D Lock Regeneration Programme

Glenfield Invicta has successfully completed Factory Acceptance Testing (FAT) for the new penstocks being delivered in partnership with KBS Maritime as part of the D Lock Regeneration Programme at His Majesty's Naval Base Portsmouth.
Go to page

Engineered Site Solutions – New Brochure

Providing Complete Turnkey Solutions
Go to page
Carbon Reduction Plan

Carbon Reduction Plan

Download
Tower Bridge 8

A Lasting Legacy: Glenfield's Place in the Story of Tower Bridge, London

Engineering excellence is measured not only by innovation, but by longevity. Few examples demonstrate this better than the presence of Glenfield valves within one of Britain's most recognisable landmarks – Tower Bridge, London.
Go to page
Maidstone Renewable Electricity Cert 2025 _ 28

Renewable Electricity Maidstone

Download pdf

Download
Stand Down 1

Engineered Site Solutions Stand Down Day

Engineers come together for a day of learning, collaboration and recognition, reinforcing the company's commitment to safety, wellbeing and professional development.
Go to page
AVK in the UK our people

AVK Stronger Together

Let us take you on a tour of AVK in the UK.

See our production facilities and offices across the UK.

Meet the people and see what we do.

Watch video
AVK Stronger Together
Horizon 2026 Sustainability Report

AVK in the UK Publishes Horizon 2026 Sustainability Report

Supporting Utilities on the Journey to Net Zero
Go to page

(Registered Co. Address) Glenfield Invicta Ltd

Queens Drive, Kilmarnock
KA1 3XB , Scotland, UK
T: +44 (0) 1563 521150
E:
Send e-mail
All contacts Privacy policy Legal Notice and Disclaimer
Follow us on

Main Reception

+44 (0)1563 521150

Join our newsletter