• About Us &
    Information
    About Us and Information
  • Market
    Segments
    Market Segments
  • Explore
    Our Products
    Our Products
  • Engineered
    Site Solutions
    Engineered Site Solutions
  • Join
    Our Team
    Join Our Team
Search
Find product
  • News
  • Downloads
  • Case Studies
  • About Us
  • Contact Us
  • AVK Holding (Group)
  • Sustainability

Search

  • Choose category
  • All
  • Penstocks
  • Gross Price List
  • Dealing with us
  • Sustainability
  • Non Utility Infrastructure
  • Clean Water and Wastewater
  • Engineered Site Solutions
  • Hydropower
  • Reservoirs
  • Policies
  • Certificates
  • Case Studies
  • Brochures

165 Result(s)

Thumbnail - Dan

Dan Brown's 10 Year Anniversary

Congratulations to Dan Brown on celebrating 10 years with Glenfield Invicta!
Go to page
Crossness Thumbnail

Crossness Case Study

Download pdf

Download
Crossness Case Study 3

Crossness Sewage Treatment Works

Glenfield Invicta is delivering a major penstock replacement programme at Crossness Wastewater Treatment Works in South East London on behalf of Glanua for Thames Water.
Go to case
Beckton Complete

Beckton Wastewater Treatment Works

Glenfield Invicta is supporting Thames Water with the upgrade of screening infrastructure at Beckton Wastewater Treatment Works in East London, one of the UK’s largest wastewater treatment facilities.
Go to case
Llyn Celyn

Llyn Celyn

Download pdf

Download
Craig Goch Thumbnail

Craig Goch Case Study

Download pdf

Download
Lochaber 3

Lochaber Site Visit

Extending Asset Life Through Sustainable Service & Maintenance
Go to page
Craig Goch 3

Craig Goch

Glenfield Invicta was an integral part of the team that specified, designed, fabricated, installed, and commissioned a new fixed cone discharge valve at the base of the Craig Goch dam wall complete with upstream reservoir specification isolation gate valve.
Go to case
InterLink 71

Interlink 71

Download
KBS Teaser Image

Glenfield Invicta Reaches Key Factory Acceptance Testing Milestone for D Lock Regeneration Programme

Glenfield Invicta has successfully completed Factory Acceptance Testing (FAT) for the new penstocks being delivered in partnership with KBS Maritime as part of the D Lock Regeneration Programme at His Majesty's Naval Base Portsmouth.
Go to page

(Registered Co. Address) Glenfield Invicta Ltd

Queens Drive, Kilmarnock
KA1 3XB , Scotland, UK
T: +44 (0) 1563 521150
E:
Send e-mail
All contacts Privacy policy Legal Notice and Disclaimer
Follow us on

Main Reception

+44 (0)1563 521150

Join our newsletter